Measured outcomes, not marketing claims.

Each case study shows context, baseline condition, what we installed, timeline, and what changed — with assumptions clearly stated.

Filter by:

Boutique Hotel Group

Reduced maintenance callouts by 40% across 12 properties

Hotels & HospitalityCalorifiers & DistributionSubscription

Context

Multi-site hotel group with ageing hot water systems experiencing frequent scaling issues affecting guest experience.

Baseline Condition

Average 8 reactive maintenance callouts per month across portfolio

What We Installed

Rising main + secondary return treatment at each property

Timeline: 6-month monitoring period

Outcome

Callouts reduced to average 4.8 per month. Guest complaints about water pressure and temperature dropped significantly.

Regional NHS Trust

Evidence pack supported £180k annual energy case

HealthcareRising Mains & ReturnsShare-of-Savings

Context

Large acute hospital with complex hot water distribution serving multiple buildings.

Baseline Condition

High energy consumption on hot water generation, frequent HX maintenance

What We Installed

Treatment on main risers and secondary returns across 4 buildings

Timeline: 12-month reporting cycle

Outcome

Energy consumption indicators showed 12-18% improvement range. Commissioning evidence and quarterly reports enabled board approval for wider rollout.

National Care Home Provider

Standardised approach across 28 sites with portfolio reporting

Care HomesHot Water SystemsService Agreement

Context

Care home operator needed consistent water system management with auditable evidence for CQC requirements.

Baseline Condition

Inconsistent maintenance schedules, variable system performance

What We Installed

Standardised installation across portfolio with unified reporting

Timeline: Rolling deployment over 18 months

Outcome

Consistent performance data across all sites. Maintenance predictability improved, supporting compliance documentation.

Municipal Leisure Trust

Chemical usage reduced, heating efficiency improved

Leisure & PoolsPool Plant & HeatingCapex Purchase

Context

Swimming pool complex with high chemical costs and frequent filter maintenance.

Baseline Condition

Chemical costs trending upward, filter backwash frequency increasing

What We Installed

Treatment on pool plant heating circuit and main distribution

Timeline: 9-month evaluation

Outcome

Chemical usage showed downward trend. Filter maintenance intervals extended. Heating efficiency indicators improved within expected ranges.

Precision Manufacturing Facility

Heat exchanger performance stabilised, reducing unplanned shutdowns

ManufacturingProcess Water LoopsSubscription

Context

Manufacturing plant with critical cooling processes affected by scale build-up.

Baseline Condition

Quarterly HX cleaning required, occasional unplanned shutdowns

What We Installed

Treatment on process water circuits and cooling loops

Timeline: 12-month monitoring

Outcome

HX cleaning extended to 6-monthly. No unplanned shutdowns attributed to scaling during monitoring period.